West Michigan General Contracting for the Grand Rapids Area
- Tapestry Square residential condo development, Water/sewer storm, Buidling excavation, curbs, walks, and asphalt drive/parking, and landscaping.
- 82 Ionia, Streetscape around building, new basement walls around two sides of six story building, extensive demolition, utility relocations, minor interior renovations.
- Dwytte Lydell Park, Reconstruct ponds and waterways to improve visual appeall and functionality. Site improvements such as Fencing, paths, landscaping, and grading.
- Kentwood Bus Transfer, Reconstruct Walma avenue with additional turn lane and concrete turn-off area for bus parking and loading/unloading. Project consisted of new concrete, storm drains, lighting, grading, landscaping, road reconstruction, and bus shelter.
- Bowen Park, Project consisted of a new park construction with picnic shelter and restroom building. New construction also included new parking, water/sewer, storm, electrical, grading, landscaping, and paved pathes.
- Rum Creek Park, New park and pedestrian path. New construction consisted of a design build for a exposed aggregate bridge, Wooden boardwalk, asphalt path, picknic areas, benches, grading, and landscaping.
- School street/Savage streetscape, large project encompassing 1/3 mile of M31in Spring Lake. New street construction, Reconstruction of M-DOT road, new walks, lighting, storm drains, colored/embossed concrete, water main, grading, landscaping, and benches/monuments.